EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Utah-Jay
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (285)
Boot Cowl
- (17)
Workshop
- (1)
Empennage
- (2)
Fuselage
- (69)
Firewall
- (4)
Tail Feathers
- (9)
-
Flying Wires
-
Cotter Pins
-
Trim Actuator covers
-
Finished covering...
-
Fabricated plates...
-
Trim Tabs
-
Rudder installation
-
Setting the Angle of...
-
Leveling the fuselage
Wings
- (9)
Controls
- (17)
Avionics
- (35)
Lighting
- (3)
Instrument Panel
- (2)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (1)
Fuel System
- (8)
Interior Finish
- (8)
Paint / Decals
- (8)
Inspection
Tools
- (1)
Engine Cowl
- (31)
Doors
- (1)
Baffling
- (12)
Cabin Air
- (1)
Builder Name:
JAY TOWNSEND
-
Project:
Companion
-
VIEW REPORTS
Total Hours:
1317.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Oct 21, 2021 - No Finish Date
Engine:
Barrow Lycoming O-360
Propeller:
Sensenich 82” GA
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=Utah-Jay
Home or Last Project Picture
Dec 02, 2021
Leveling the fuselage
- (2 hours)
Category: Tail Feathers
This was initially a massive task. Do not do what I did and try to level the fuselage with digital levels. After some frustration I called Mark and he educated me on a water level. WOW what a difference. Fuselage all leveled so I can start working on the horizontal stabilizer
6EBC2F5C-2A04-42C5-BE6B-23553BD929E1.jpeg
66770014-ABB5-4D6F-806F-D7F87C1B72C7.jpeg
FDC39A12-76CD-4CEC-94ED-17567769C01C.jpeg
17253E5E-A93A-40A5-A639-30FC8158A2E8.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.